Roofing 2010

Roofing 2010
9/18 North side underway - first week. It turned into a horror show and took over two months to complete.
North side from attic Lots of cleanup.
8/21 Two days of work and the roof is covered for the weekend. Heavy rain on Saturday night. Contractor txt'd me at midnight during the rain to make sure…
Around 8/27. South side after week and a half. Front porch still covered, upper peak on front not done.
9/12 About two weeks later the roof is almost done except for narrow strips across the front, flashing, fascia and gutters.
Sep 19 am before the fascia and aluminum wrap
Sep 19 pm after fascia and aluminum wrap
Not quite enough aluminum
Flashing not done on porch or uppper small roof extension.
Front porch unresolved. Flashing not yet done.
Trash we pulled out of the attic ourselves.
Other trash still left as of Sep 20.
Oct 1. South side of the house.The long lengths were in place but no downspouts. (I needed to buy 2x3 downspouts instead of 3x4 that I had.) Nothing fabricated…
Southeast corner. No idea what they were thinking to leave this sticking out in the air a foot and the end piece installed.
Southwest corner. Corner hangs at odd angle and suggestion was made that a downspout might be necessary in there becuase it would not drain across the front -…
The northeast corner appears to be installed correctly. No further work was done over the weekend - two dry days.
Lee came over to rebuild sections of the roof. One corner was so bad there was no way to mouont the gutters.
Some of it had to be totally replaced